Tuesday, February 23, 2010

Re-Routed

I didn’t get as much done on my project today because I ran into a problem with my router. The trigger quit working. I spent 2 1/2 hours opening the switch up finding what I thought was the problem-sawdust build-up on the contact- and then reassembling the unit. My fix did not work. I have a second router that also doesn’t have a working trigger. It starts up when it is plugged in so I have to be very careful with it. I usually use that router with my router table that has a switched outlet. I finished my routing with the backup. That was all I had time for today. The doors and drawer facings are cut to size and shaped by the router. Next comes hanging the doors and facing the drawers. That’s what I had hoped to do today in that 2 ½ hours.


That was my day. At least it was a beautiful weather day and I was outside all day. It’s supposed to rain tomorrow morning so I will do indoor stuff(my full time job of housework).