I moved them and slid them into the CRV on my lumber mover. It worked OK. I used it as a ramp to slide the trap into the CRV. This was much Easier than lifting them in.
I went to my usual release point, opened the trap and with no hesitation the 2 critters took off.
The rest of the morning I worked on the deck and finished all of the top rail that will support the 100+ little rails. The neat part of the job was that I was able to use the deck in the process of building it. I set up my miter saw on the deck and did all my cutting there. I think the deck will work well.
After lunch it’s back to railing.
No comments:
Post a Comment